The library and community center at the top of Connecticut Avenue are being replaced, and the plan has a developer, a design concept and a bill before the DC Council. The city's description of what follows a Council vote adds up to about four years before a new building opens. For anyone who uses the story-time room, the pottery studio or the playground at 5601 and 5625 Connecticut Avenue NW, the bigger question is what fills the gap once the old buildings close, and the library director has already described the answer as a small storefront with no programs.
Where the Plan Stands
On January 16, 2026, the Mayor's office announced the selection of Rift Valley Chevy Chase LLC to redevelop the Chevy Chase Civic Site. The selection followed a request for proposals that the Deputy Mayor for Planning and Economic Development issued two years earlier, on January 17, 2024. The selected plan replaces both buildings with a 23,500-square-foot library and a 21,600-square-foot community center. It also adds about 8,000 square feet of community-serving retail and expands the outdoor space.
The plan includes housing as well. Rift Valley's original proposal had 206 homes. The current concept has 177, after revisions that reduced the building massing and added workforce housing. According to the deputy mayor's office question-and-answer document updated June 3, 2026, 80 of those homes would be affordable and 97 market-rate, and 81 would have two or three bedrooms. The same document describes the design as early and not final. Building height and some outdoor uses were still open questions.
Bill B26-0801, the Chevy Chase Civic Site Surplus Declaration and Disposition Approval Act of 2026, was introduced September 16 at the Mayor's request. It was referred to two committees, Facilities and Human Services. The Committee on Human Services, chaired by Ward 3 Councilmember Matthew Frumin, held its hearing on November 12. The hearing transcript shows it opening at 10:02 a.m. and adjourning at 7:52 p.m. The Committee on Facilities, chaired by Councilmember Janeese Lewis George, has its hearing scheduled for December 3. The public record for that hearing closes December 17.
Neighbors disagree about the plan, and the official record shows it. ANC 3/4G passed a resolution opposing the surplus declaration on October 26 and another opposing the disposition on November 9. Both were published with minority opinions, and both are posted on the commission's zoning and development page. At the November 12 hearing, the directors of DC Public Library, the Department of Parks and Recreation and the deputy mayor's office each testified in support. Frumin said the project should deliver mixed-income housing, context-sensitive height, green space and appropriately sized civic facilities. He also described the neighborhood as divided and cautioned against any one side claiming to speak for a settled majority.
What Happens After a Vote
Late in the hearing, Frumin asked the deputy mayor's office what happens between Council approval of the land disposition agreement and the actual closing. The office's answer, as recorded in the transcript, was that approval gives the developer "a green light." After that, developers "have about two years to work on their funding stack" before they come back to close. The office said final design, traffic studies and permits all happen in that window, and construction follows closing. Its June document puts construction at approximately 24 months, with no start date attached.
Two years of financing and design plus two years of construction comes to roughly four years from a Council vote to a new building. No vote date is on the calendar yet. The buildings on the site today date to 1968 for the library and 1971 for the community center. The date they close has not been set, and the library director said at the hearing that he could not say when that would be.
What the Library Becomes During Construction
DC Public Library Director Richard Reyes-Gavilan told the committee that the library does not look for interim space until it knows when the existing branch will close. He said the developer is responsible for finding the interim space, typically a storefront. Then he described what those spaces are like: "very small," built for "the most basic services like picking up holds, maybe a few computers for the public to use," plus a printer and copier. "They are typically not programs," he said, and called the space "transactional" in nature.
So the closure, when it comes, will mostly affect programming. The Chevy Chase Neighborhood Library runs recurring events such as Baby Lap Time for children from birth to age 5 and a Terrific Movie Tuesday afternoon screening for adults and seniors. A storefront built for holds pickup will not have room for those.
The community center has the bigger gap to fill. The DPR page for the Chevy Chase Community Center describes a full-service facility for toddlers through seniors, with dance, fencing, pottery and woodworking spaces. Its posted school-year hours are 9 a.m. to 9 p.m. on weekdays and 9 a.m. to 5 p.m. on Saturday. The building has an auditorium, an art room, a classroom, a dance and ballet studio, a darkroom and two multipurpose rooms. Outside are a basketball court and a playground. DPR Director Thennie Freeman testified that the new center should support at least the current level of programming, and potentially more. No temporary location for those classes has been named. An ANC commissioner raised that point in testimony on November 12, noting that no interim community center was funded.
The nearest full-service DC library to the north end of Connecticut Avenue is Cleveland Park Library at 3310 Connecticut Ave. NW. Its regular hours are 9 a.m. to 8 p.m. Sunday through Wednesday, noon to 8 p.m. Thursday, and 10 a.m. to 6 p.m. Friday and Saturday. Tenley-Friendship Library at 4450 Wisconsin Ave. NW is the other close branch. For families who rely on a weekly story time, those two branches are the practical backups once the Chevy Chase branch closes.
What the New Site Is Designed to Hold
Outside the new library and community center, the Mayor's announcement lists a play park and public plaza, flexible sports and event courts, an amphitheater, a roof terrace that doubles as an outdoor classroom, an oak lawn and a native-plant garden. In its June document, the deputy mayor's office said the design is early and that plant selection and maintenance details are still to be worked out.
The retail is open-ended too. The deputy mayor's office said the use and tenants for the roughly 8,000 square feet had not been determined, and that an existing Connecticut Avenue business could move into the new space. That would keep a familiar name on the block when the new building opens.
Traffic around the site would change as well. In the same document, the District Department of Transportation proposed a new crosswalk at Oliver Street and a ban on the southbound Connecticut Avenue left turn onto eastbound Northampton Street. Two parking spaces on the avenue would be removed to improve visibility.
The Avenue Is Changing on a Similar Schedule
Other work along Connecticut Avenue is on a similar multi-year schedule. DDOT's Connecticut Avenue multimodal project covers intersections from Calvert Street north to Oliver Street. Work began in summer 2026, with Tilden Street listed as under construction, and DDOT expects to finish over the following two years. Its September 2026 update kept the bus stops at Chesapeake and Brandywine Streets in place and moved ahead with daylighting at both intersections.
The Next Dates to Watch
The Committee on Facilities hearing on December 3 is the next public step. Written testimony for its record is due by 5 p.m. on December 17. The bill's Council page lists each action as it happens and links the video of both hearings. ANC 3/4G posts its resolutions, slide decks and minority opinions on its civic site page.
A four-year rebuild on the main civic block is part of what owners near Connecticut Avenue will be living alongside. Brittanie DeChino works with buyers and sellers across Washington's neighborhoods. If you own nearby and want a calm, clear read on what your home is worth today, you can request a home value anytime.